Create a sprint
POSThttps://
Creates an upcoming sprint on a project and returns it with a Location header: is_active is false and started_at and completed_at are null, whatever start_date and end_date say; planning dates does not start a sprint.
Access
- Token scope
- api:
write: project_management Without it:
403 insufficient-token-scope. - Permission
- project_management::
manage_sprints Without it:
403 insufficient-permission. - Rate cost
- 1 unit, write bucket. A write costs the same whatever
viewyou ask for. - Also
- Accepts
Idempotency-Key. Never cached:private, no-store. Unknown body keys are refused, never dropped.
Both are checked, scope first. A token never does more than its user. How access is checked
Start it with POST sprints/{sprint}/actions/start. order is not accepted: the new sprint is placed last within its project and is reordered only in plnnrly. project_id is accepted here and only here: a sprint cannot be moved between projects.
Query parameters
Unknown parameters are refused with 400, naming the parameter.
Request headers
A correlation id of your own. It is recorded in our logs next to the server's request id but never returned: the response header always carries the server's id. A value that does not match the pattern is discarded silently, never rejected.
Request body
Unknown keys are refused with 422, naming the key.
The project this sprint belongs to. A sprint cannot be moved between projects, so this is accepted on create only.
Planned first day of the sprint. Independent of started_at: planning a date does not start the sprint.
Response 201
Returns a Sprint in the detail view.
Headers
ETag- A strong validator of exactly this representation.
Idempotency-Replayedtruewhen this response was replayed from a storedIdempotency-Keyrather than produced by a new write.Location- The absolute URL of the created or queued resource.
RateLimit- The IETF
httpapi-ratelimit-headersform of your remaining allowance on the tightest bucket this request touched. RateLimit-Policy- The ceiling and window of that bucket, as
<limit>;w=<seconds>. X-Request-Id- The server-generated ULID correlating this response with our logs.
Every response also carries Cache-Control, Vary, X-Content-Type-Options, X-Plnnrly-Api-Version, X-RateLimit-Limit, X-RateLimit-Remaining, X-RateLimit-Reset. Headers and versioning
The project this sprint belongs to. A sprint cannot be moved between projects, so this is accepted on create only.
Planned first day of the sprint. Independent of started_at: planning a date does not start the sprint.
When the sprint was actually started. Written only by POST sprints/{sprint}/actions/start; null on an upcoming sprint.
When the sprint was actually completed. Written only by POST sprints/{sprint}/actions/complete; null until then. Non-null is what makes the derived state completed.
Whether this is the project's running sprint. Set by actions/start and cleared by actions/complete, never by PATCH. At most one sprint per project is active at a time.
Display position within the project. Assigned on create as the last position in that project's sprint order, changed only by reordering in plnnrly, and not writable.
Number of work items currently on this sprint, resolved and unresolved alike.
The project this sprint belongs to. Expanding it additionally requires the projects prefix's read grant and a token scope covering it.
Errors
409 Conflict.
415 Unsupported media type.
422 Unprocessable content.
7 errors every operation can return: 400, 401, 404, 406, 429, 500, 503
400 Bad request.
idempotency-key-requiredinvalid-cursorinvalid-query-parametermalformed-requestunsupported-parameter
401 Unauthenticated.
404 Not found.
406 Not acceptable.
429 Too many requests.
500 Server error.
503 Service unavailable.
This path allows GET, POST. Anything else answers 405.
Something wrong or missing on this page? Tell us