Read a sprint
GEThttps://
Returns one sprint in the detail view.
Access
- Token scope
- api:
read: project_management Without it:
403 insufficient-token-scope. - Permission
- project_management::
view_active_sprint Without it:
403 insufficient-permission. - Rate cost
- 1 unit, read bucket.
- Also
If-None-Matchanswers304when nothing changed. Never cached:private, no-store. Unknown query parameters are refused, never ignored.
Both are checked, scope first. A token never does more than its user. How access is checked
The state is derived, not stored: completed_at non-null means completed, otherwise is_active true means active, otherwise upcoming. work_items_count is the number of items on the sprint and links.work_items is the URL that lists them. Reading additionally requires project_management::manage_sprints.
Path parameters
Query parameters
Unknown parameters are refused with 400, naming the parameter.
Request headers
A correlation id of your own. It is recorded in our logs next to the server's request id but never returned: the response header always carries the server's id. A value that does not match the pattern is discarded silently, never rejected.
Response 200
Returns a Sprint in the detail view.
Headers
ETag- A strong validator of exactly this representation.
RateLimit- The IETF
httpapi-ratelimit-headersform of your remaining allowance on the tightest bucket this request touched. RateLimit-Policy- The ceiling and window of that bucket, as
<limit>;w=<seconds>. X-Request-Id- The server-generated ULID correlating this response with our logs.
Every response also carries Cache-Control, Vary, X-Content-Type-Options, X-Plnnrly-Api-Version, X-RateLimit-Limit, X-RateLimit-Remaining, X-RateLimit-Reset. Headers and versioning
The project this sprint belongs to. A sprint cannot be moved between projects, so this is accepted on create only.
Planned first day of the sprint. Independent of started_at: planning a date does not start the sprint.
When the sprint was actually started. Written only by POST sprints/{sprint}/actions/start; null on an upcoming sprint.
When the sprint was actually completed. Written only by POST sprints/{sprint}/actions/complete; null until then. Non-null is what makes the derived state completed.
Whether this is the project's running sprint. Set by actions/start and cleared by actions/complete, never by PATCH. At most one sprint per project is active at a time.
Display position within the project. Assigned on create as the last position in that project's sprint order, changed only by reordering in plnnrly, and not writable.
Number of work items currently on this sprint, resolved and unresolved alike.
The project this sprint belongs to. Expanding it additionally requires the projects prefix's read grant and a token scope covering it.
Errors
8 errors every operation can return: 304, 400, 401, 404, 406, 429, 500, 503
304 Not modified.
400 Bad request.
idempotency-key-requiredinvalid-cursorinvalid-query-parametermalformed-requestunsupported-parameter
401 Unauthenticated.
404 Not found.
406 Not acceptable.
429 Too many requests.
500 Server error.
503 Service unavailable.
This path allows GET, PATCH, DELETE. Anything else answers 405.
Something wrong or missing on this page? Tell us